- Index
- » Members Only Content (COO membership required)
- » Aviation Alerts
- » Cessna: 182J; Cracked Aft Fuselage...
Page:
1
Cessna: 182J; Cracked Aft Fuselage Bulkhead; ATA 5312
Cessna: 182J; Cracked Aft Fuselage Bulkhead; ATA 5312
A mechanic describes finding cracks in both sides of this original bulkhead in the upper corners of the rudder cable cutouts -- between the cutouts and the flange. “Dye penetrant inspection of the front of the flange revealed no defects. Inspection of this bulkhead was previously accomplished at 3,607.0 hours—not required for inspection under AD 72-07-09 until 4,607.0 hours. (I) recommend shorter inspection intervals.” (This cracked...) bulkhead (P/N 712616-1) was replaced. (Search of the SDRS data base returns 50 bulkhead related defects on the 182 series aircraft.)
Part Total Time: 4,470.3 hours.
Only registered users or members can reply or post
Page:
1
- Index
- » Members Only Content (COO membership required)
- » Aviation Alerts
- » Cessna: 182J; Cracked Aft Fuselage...
Board Info
- Board Stats:
- Total Topics:
- 5972
- Total Polls:
- 1
- Total Posts:
- 16303
- Posts this week:
- 2
- User Info:
- Total Users:
- 2093
- Newest User:
- Paul Laurin
- Members Online:
- 1
- Guests Online:
- 1300
- Most Active Users:
- Director, jplaxton00, helpdesk, reecedaniel, Cessna Tech, Larry Stanford, Rick Gardner, Bob H, wrbrent, mike11003
- Online:
- carlguilliams
Forum Legend:
Topic
New
Locked
Sticky
Active
New/Active
New/Locked
New Sticky
Locked/Active
Active/Sticky
Sticky/Locked
Sticky/Active/Locked